Cost figures on Stanford house
Development charges for lot $ 6,750
Original contract price (basic house only) 34,210
Plan modifications (archatect fee) 136
Extras because of modifications 1,233
Site preparation charges 250
Extra excavation as requested by Mr.Crawford 115
Landscape architect 750
Original fence contract 2,524
Extra fencing 153
Original contract for irrigation and plantings 4,300
Additional costs of alternate plantings 117
Extension to irrigation 71
Extra exterior light fixtures 110
Extra lighting fixtures interior 135
Extra outlets 73
Extras to Tersini on 11/6/68
kitchen spray attachment 16.30
ash panelling in family r 167.00
Soffits in kitchen 153.40
concrete flat work 447.00
paint vs stain grade doors 31.60
extr insulation in garage 30.00
extr linoleum in dressing a 67.50
total 913
Antennae and installation 95
Fire place screens as installed 67
Plate glass extra charge 125
Extras to Coaz 303
Additional trees 45
Patio alteration charges 360
Special stone for patios 55
Front shade basic costs 152
Front drain extension 118
Built-in work bench in garage and light 34
Recessed ceiling lights 43
Outside storage space construction 142
Extras for kitchen appliances installed 153
Stainless steel stove burnar pans 9
Side walks 265
Carpeting 1,978
Installed curtains 529
Additional drapes 325
Mail and post with house numbers 28
Trellis 16
Shutters for front door 47
Lumber and hardware for built-in typewriter drawer 27
Hose reels and connections 84
Bird bath 27
Extra hardware locks,closet fittings etc. 76
Terraced flower bed 96
Exposed aggregate stepping stones (6) 42
Wall paper (not covered by contract) 76
Extra painting requested by owner 115
TOTAL INITIAL COST $57,267
Data compiled as of June 23, 1974